NIST800-CM-2 CM-2 Baseline Configuration
NIST800-CM-2 in NIST SP 800-53 Rev 5 (NIST SP 800-53 Rev 5, Release 5.2.0). All NIST SP 800-53 Rev 5 controls held. Open NIST SP 800-53 Rev 5 on the standards site.
The control as we hold it
CM-2 Baseline Configuration. a. Develop, document, and maintain under configuration control, a current baseline configuration of the system; and b. Review and update the baseline configuration of the system: 1. [Assignment: organization-defined frequency]; 2. When required due to [Assignment: organization-defined circumstances]; and 3. When system components are installed or upgraded.
Reviewed and closest counterparts in the other frameworks
Reviewed rows come from a released pair; a closest match is the nearest held text and is not a reviewed row.
SOC 2
- SOC2-CC5.2 CC5.2 General controls over technology (COSO principle 11) (closest match)
- SOC2-CC7.1 CC7.1 Detecting configuration changes and new vulnerabilities (closest match)
- SOC2-CC8.1 CC8.1 Managing changes to procedures, software, data and infrastructure (closest match)
What an auditor commonly asks for
General guidance for this control area (domain: CM - Configuration Management), in our words, not a statement of the standard and not binding on an assessor.
- the configuration baseline
- the change-control records
- the component inventory with owners